Private label fragrance manufacturing for the USA, UK and European markets

We also sell empty bottles and caps. Perfume bottles, cologne bottles in glass and plastic, and caps — supplied empty, ordered by the model.

Order bottles & caps
Home, Candle & Car Fragrance

Home Fragrance Packaging and Safety Decisions

Home-fragrance packaging must contain the product through filling, transport, storage and consumer use while carrying the correct warnings and regulatory information. A bottle or vessel chosen for appearance is only a candidate until formula compatibility, closure, leakage, stability and handling are assessed.

Classify the product and use

Room spray, reed diffuser, candle and fragrance oil create different hazards and user actions. Define fill, carrier, closure, application, expected surfaces and destination markets. The packaging review begins with the finished mixture and foreseeable use, not a generic supplier statement.

Test material compatibility

Expose the intended glass, plastic, gasket, plug, pump, coating, ink, adhesive and label to the finished formula under relevant conditions. Observe swelling, cracking, softening, colour transfer, lifting and odour change. A component compatible with alcohol may not suit diffuser base or concentrated oil.

Validate closure and transport

Specify torque, crimp, plug insertion or other assembly settings and inspect them during production. Run upright, inverted and vibration or transit simulations appropriate to the pack. Test decorated production components because coatings and dimensional variation can alter fit.

Design safe consumer handling

Provide stable placement, surface-protection and spill instructions where relevant. Candles need suitable vessel, warning and burn-use information; diffusers need removal and reed instructions; sprays need clear application precautions. Review readability after all required market text is present.

Control pack changes

Tie component supplier, material, drawing, finish and revision to the finished specification. Require approval before substitution. Retain packed references and complaint samples. Reopen affected tests after formula, closure, decoration, label stock, fill or transit configuration changes.

Project checklist

  • Finished-mixture classification
  • Material compatibility
  • Closure specification
  • Leak and transit test
  • Consumer warnings
  • Production assembly checks
  • Substitution change control